OpenBuildings™ Station Designer Help

Using the hook up tool to complete a route

  1. Two new runs are added to a main branch. They are located at different elevations and are offset from the center line of the main branch. A tee fitting is in place.


  2. Select (Device Hookup) to route from the first new run to one of the tee's branches. Select the tee, then the duct. The new route is seen in dynamics, and precisely placed using AccuDraw distance locks.


  3. Repeat step two for the second new run.


  4. Review the new routes that connect the two new runs. Some manipulations may be needed to clean up the routes.